Our Projects
ENHANCED DESIGN CAPABILITIES:
Our focus on continual improvement of design capabilities in diverse industries, such as civil engineering,
industrial
production, healthcare, and fueling stations, sets us apart. Our expertise includes designing industrial and
commercial
HVAC systems, electrical and mechanical installations, process pipelines, and electrical cable runs. With unmatched
experience in these industries, our team is the preferred choice for a reliable contractor.
HEALTHCARE PROJECT
Our team was involved in the design of electrical networks for one of the leading scientific centers. It specializes in the development of medicine for cancer.
Team: 5 BIM engineers.
Implementation time - 15 months.
INDUSTRIAL PLANT
Big European industrial plant producing microprocessors.
Our team was responsible for electric, emergency, low-voltage and lighting systems. Cable trays and ladders have been the greatest part of the project.
Team: 4 BIM engineers.
Duration: 12 months.
GAS PLANT
Gas distribution compression plant is designed to supply gas to household dwellings, industrial buildings and other kinds of gas consumers. BIMTAL responsibilities were designing each and every unit of this plant and creating unique families and templates for the client.
Team: 5 BIM engineers.
Implementation time: 14 months.
LONDON RESIDENTIAL BUILDING
Residential building in the center of London with special conditions for the wheelchair
people.
Our team was responsible for full-stack drawing and blueprinting process of engineering
systems and their
coordination.
Team: 5 BIM engineers.
Implementation time: 14 months.
COMMERCIAL BUILDING
Hotel and cafe building in England.
Our team was responsible for the entire design phase. From the calculation of heat
losses of the building to the
calculation of the lighting system in Dialux, as well as HVAC, Electrical and Plumbing
systems.
Team: 4 BIM engineers.
Implementation time: 9 months.
COMMERCIAL/RESIDENTIAL BUILDING
Commercial and residential building in London.
Commercial premises (offices, cafe, gym, library, etc.) are located on the ground floor,
residential apartments are
located above.
Our team was responsible for the design of heating, ventilation and water supply.
Team: 3 BIM engineers.
Implementation time: 9 months.
COMMERCIAL BUILDING
Hotel in London.
Our team was responsible for the entire design phase.
Reconstruction of the ancient building with technology of Point Cloud scan. We have designed HVAC, Electrical and
Plumbing systems.
Team: 3 BIM engineers.
Implementation time: 6 months.