Our Projects


ENHANCED DESIGN CAPABILITIES:
Our focus on continual improvement of design capabilities in diverse industries, such as civil engineering, industrial production, healthcare, and fueling stations, sets us apart. Our expertise includes designing industrial and commercial HVAC systems, electrical and mechanical installations, process pipelines, and electrical cable runs. With unmatched experience in these industries, our team is the preferred choice for a reliable contractor.



HEALTHCARE PROJECT

Our team was involved in the design of electrical networks for one of the leading scientific centers. It specializes in the development of medicine for cancer.

Team: 5 BIM engineers.
Implementation time - 15 months.

INDUSTRIAL PLANT

Big European industrial plant producing microprocessors.

Our team was responsible for electric, emergency, low-voltage and lighting systems. Cable trays and ladders have been the greatest part of the project.

Team: 4 BIM engineers.
Duration: 12 months.

GAS PLANT

Gas distribution compression plant is designed to supply gas to household dwellings, industrial buildings and other kinds of gas consumers. BIMTAL responsibilities were designing each and every unit of this plant and creating unique families and templates for the client.

Team: 5 BIM engineers.
Implementation time: 14 months.

LONDON RESIDENTIAL BUILDING

Residential building in the center of London with special conditions for the wheelchair people.
Our team was responsible for full-stack drawing and blueprinting process of engineering systems and their coordination.

Team: 5 BIM engineers.
Implementation time: 14 months.

COMMERCIAL BUILDING

Hotel and cafe building in England.
Our team was responsible for the entire design phase. From the calculation of heat losses of the building to the calculation of the lighting system in Dialux, as well as HVAC, Electrical and Plumbing systems.

Team: 4 BIM engineers.
Implementation time: 9 months.

COMMERCIAL/RESIDENTIAL BUILDING

Commercial and residential building in London.
Commercial premises (offices, cafe, gym, library, etc.) are located on the ground floor, residential apartments are located above.

Our team was responsible for the design of heating, ventilation and water supply.

Team: 3 BIM engineers.
Implementation time: 9 months.

COMMERCIAL BUILDING

Hotel in London.
Our team was responsible for the entire design phase.
Reconstruction of the ancient building with technology of Point Cloud scan. We have designed HVAC, Electrical and Plumbing systems.

Team: 3 BIM engineers.
Implementation time: 6 months.